Hill Country 138 kV line
1,140 structures over 210 miles, inspected in six weeks without an outage.
- Client
- Regional transmission utility
- Year
- 2025
- Role
- Visual and thermal inspection
The challenge
The utility needed a full condition survey before summer peak load, with no outages and limited road access.

The approach
Three crews flew sections in parallel, inspecting each structure with zoom and thermal cameras and tagging every finding to the utility's structure ID.

The result
37 priority findings were sent to line crews within 24 hours, and the full report loaded straight into the utility's asset management system.